This week's Department of Transportation road construction update:

Brown County: Dousman Street in Green Bay is closed from Military Avenue to Platten Street through late August. U.S. 141 (Main Street) in Green Bay is reduced to one lane between Baird Street and the Fox River through October. Brown County JJ (Eaton Road) is closed between Manitowoc Road and Brown County EA through November.

Calumet County: U.S. 10 is closed at Calumet County N through October for conversion of the intersection to a roundabout and expansion of the Park and Ride lot at the intersection. The 10 detour is Wisconsin 114 and Wisconsin 55; the N detour is 55, 114 and Calumet County KK.

Door County: The Wisconsin 57 four-lane project is continuing between Door County H and South County Line Road. The intersections of 57 and Kewaunee County A and 57 and Stone Road in Door County are being reconstructed through this week. Through Friday, 57 traffic is reduced to one lane one-half mile south to one-half mile north of Stone Road. The Oregon Street Bridge project in Sturgeon Bay is wrapping up.

Fond du Lac County: Wisconsin 175 (South Main Street) is now open as part of the U.S. 151 bypass project, but the 151/175 interchange is closed until Oct. 3. Reconstruction of the U.S. 41/Wisconsin 23 interchange is continuing. Between Townline Road and Scott Street, the left lane of southbound 41 will be closed from Monday at 6 p.m. to Tuesday at 6 a.m., and the right lane of southbound 41 will be closed from Tuesday at 6 p.m. to Wednesday at 6 a.m. The U.S. 41/Hickory Street interchange is closed for reconstruction through November 2009, although the Hickory Street bridge over 41 will be open through October; lane closures will occur between 6 p.m. and 6 a.m. through Labor Day weekend.

Manitowoc County: U.S. 10/Wisconsin 310 is closed between the Branch River and Manitowoc County R through August. U.S. 10 (Eighth Street) in Manitowoc is now open between Madison Street and Washington Street. Wisconsin 67 is being repaved between U.S. 151 and Manitowoc County AA through September. Interstate 43 interchanges at Manitowoc County V, County K and Wisconsin 147 are having work through October; 43 is open but V, K and 147 are restricted to 11-foot lane widths, and ramps will be periodically closed.

Marinette County: U.S. 41 is limited to one lane in each direction north and south of Peshtigo as part of the 41 four-lane project.

Marquette County: Wisconsin 23 is closed between Marquette County M and Ninth Avenue until Aug. 28.

Oconto County:
The U.S. 41 four-lane project continues through August 2009, mostly away from the existing route.

Outagamie County: College Avenue in Appleton is closed between Rankin Street to John Street and Walter Avenue for the bridge replacement project. The signed detour is Wisconsin 47, Outagamie County OO (Northland Avenue) and Wisconsin 441. Outagamie County S is now open at 47 as part of the Ballard Road Park and Ride expansion. Wisconsin 76 is expected to be open between Wisconsin 54 and Bear Creek late this week. Wisconsin 55 (Crooks Avenue) in Kaukauna is closed between 18th Street and Seventh Street through November. Wisconsin 441 is reduced to one lane in each direction from Outagamie County CE (East College Avenue) to Outagamie County OO (East Northland Avenue) for repairs to the Fox River Bridge. Lane closures on 441 between U.S. 10 (Oneida Street) and the north 441/U.S. 41 interchange will occur between 8:30 a.m. and 3 p.m. and between 6 p.m. and 6 a.m.

Shawano County: Wisconsin 22 is closed between Wisconsin 156 and Wisconsin 29 through early September. U.S. 45 has lane closures and flagging operations between Wisconsin 29 and the north county line through late October.

Sheboygan County: Sheboygan County V is closed between Wisconsin 57 and Sheboygan County I until mid-September.

Waupaca County: Wisconsin 22 has lane closures and flagging operations between the Waupaca–Portage county line and U.S. 10 through Monday, and is closed between Wisconsin 156 and Lake Wagner Road until late Aug. 28. The Wisconsin 22/54 roundabout project in the 22/54 Waupaca east bypass is expected to be completed Sept. 4, with 11-foot width restrictions and flagging operations until then.

Waushara County: Interstate 39/U.S. 51 is having centerline work from Tuesday to Thursday.

Winnebago County:
U.S. 45 is closed from Winnebago County G to Winnebago County II until the end of August. The 45/Winnebago County T interchange project should be complete by Wednesday. Oakwood Road in the Town of Algoma is closed between Winnebago County E (Witzel Avenue) and Wisconsin 21 through October. Wisconsin Street over the Fox River to Campus Place in Oshkosh is closed for the bridge replacement and road reconstruction project until Oct. 11. South Commercial Street from South Park Avenue to Lyon Drive in Neenah is closed until the end of August. Lane closures on Wisconsin 441 from U.S. 41 to U.S. 10 (Oneida Street) will be scheduled between 6 p.m. and 6 a.m.